Version 2 is out now

The peptide tracker that does the math.

Dose volumes calculated, vials counted down, reminders right on time. Built around real protocols, not spreadsheets.

Download on the App Store

$3.99 once. No subscription, no account, no ads.

  • 4.4 on the App Store
  • Your data stays on your phone
  • Built by one person who uses it daily
ShotTrackr home screen
What's new in version 2

The biggest update yet.

New

Simple Mode

Skip inventory entirely. A focused experience built around logging doses, tracking weight, and keeping tabs on what you're taking.

New

Medication Level chart

Where your levels were, and where they're headed — historical and projected, based on your actual dosing schedule.

New

Titration & cycles

Escalating dose steps that advance on their own, and off-cycle periods that pause reminders without manual toggling.

New

Analytics page

Dose and weight trend graphs on a dedicated page, so you can see patterns across weeks instead of single days.

New

CSV & PDF export

Your full dose and weight history, exported and ready to hand to your doctor or file away.

Improved

Smarter reminders

Notifications grouped by day and built per dose time — you only get pinged for what's actually still pending.

The fundamentals

Five things, done properly.

Everything in ShotTrackr serves the same goal: the simplest tool that still fits a real protocol.

Inventory

An inventory that counts itself down.

Every dose you log decrements the right vial. When an active vial runs out, ShotTrackr promotes its linked stock vial automatically, so injection night never starts with a scavenger hunt.

  • Active and stock states for every vial
  • Auto-activate stock when active runs out
  • Expiration dates with advance warnings
  • Reconstituted, pre-made, or pens
ShotTrackr inventory screen with active and stock vials
Dose math

Set the strength once. Read units forever.

Enter your vial strength and reconstitution volume one time, and every dose shows the exact units to draw on a visual syringe. A standalone calculator covers the quick one-off questions too.

  • Draw volume calculated per vial
  • Visual syringe with the exact draw line
  • mg, mcg, and IU dose units
  • Standalone calculator, no setup needed
ShotTrackr dose calculator with visual syringe
Schedules

Titrations, cycles, and odd intervals welcome.

Daily, weekly, every-3.5-days, weekday-specific — set the cadence once and the reminders follow. Titration steps escalate on their own, and off-cycle weeks pause notifications without you touching a thing.

  • Daily, weekly, interval, and weekday cadences
  • Titration schedules with escalating steps
  • On/off cycles that pause reminders automatically
  • Advance reminders, configurable per dose
ShotTrackr schedule configuration screen
Blends & Stacks

Multi-component protocols in one tap.

Running a blend (several peptides, one vial) or a stack (several vials, one schedule)? ShotTrackr tracks each component's dose and inventory separately, and logs the whole regimen in a single tap.

  • Blends: multiple peptides, single vial
  • Stacks: multiple vials, one schedule
  • Per-component doses and units
  • Each component decrements independently
ShotTrackr blend and stack support
Weight & Analytics

Progress you can actually see.

Log weight in seconds, set a goal, and let Apple Health sync both ways. The Analytics page charts dose and weight trends side by side, so you can see whether the protocol is doing its job.

  • Weight logging in lbs or kg
  • Goal tracking with smart unit conversion
  • Two-way Apple Health sync
  • Dose & weight trend charts
ShotTrackr analytics screen with trend charts
Try it here

Do the math right now.

This is the calculation ShotTrackr runs for every vial. Punch in your numbers and read the syringe.

Syringe
20 units

0.20 ml at 2.5 mg/ml

Reference math for U-100 insulin syringes. Always confirm your protocol with your provider.

How it works

Set up once. Tap forever.

From a fresh install to a tracked protocol in under two minutes.

1

Add your vial

Pick a peptide from the built-in list (or type your own), enter strength and reconstitution volume, and the dose math is set for good.

2

Set the schedule

Choose your cadence, dose times, and advance reminders. Titration steps and off-cycles are part of the schedule, not a workaround.

3

Log in one tap

Tap, pick the injection site, done. Inventory decrements, the reminder clears, and your history and charts update on their own.

Pricing

This is the whole pricing section.

No tiers to compare, no annual toggle, no asterisks. One price, everything included.

$3.99 once. That's it.

You get

  • Every feature, from day one
  • All future updates
  • Unlimited vials, doses, and logs
  • No account — start immediately
  • Data stays on your device

You'll never see

  • Monthly subscription
  • Feature paywalls
  • Ads or trackers
  • Login screens
  • Your data on someone's server
Get ShotTrackr for $3.99
From the App Store

Real reviews, pulled at build time.

These come straight from the App Store feed whenever this site is rebuilt. We don't write them; we just re-typeset them.

Good tracker in the works

So many of these shot tracker apps try to take advantage of people. They come in and with feedback from the peptide community, they develop their app for free. Then when they get to a certain point they cut off features and make put them under a subscription format. These plans are usually pretty costly and not worth it in my opinion. I completely am for a dev making money off their time and efforts, it’s just that some it feels like a bait and switch. In comes this app, ShotTrackr, with a one time fee that is very reasonable. Thank you so much! It has many, if not more of the common features you see with weight and shot tracking apps, and provides it for a modest fee. I like the layout and design of the app. 10/10 no notes☺️

M
MasonMSU
App Store · v2.1.1

LOVE THIS APP!

So I’ve been using ShotTrackr for a couple of months now and I LOVE IT! It’s so easy to use and Blaine the developer is fantastic. Always open to feedback and feature requests as well as quick at fixing bugs. I also love that it’s a “buy it once and it’s yours” model instead of what seems to be the standard subscription model nowadays. I also like that the data is LOCAL. It stays on my device and isn’t uploaded to a server I don’t control. 10/10 would HIGHLY RECOMMEND!

D
dbduwgdnak
App Store · v1.6.0

Highly recommend

As an older user the functionality and ease of use is a great benefit, and just starting my journey and being able to set up everything needed for tracking is a added bonus.

K
Kevo99669
App Store · v1.5.3

Great app, super responsive dev

App has so much potential! Developer is super helpful and has added features that I’ve asked for. Can’t wait to see how it improves!

D
DavidPhillips2
App Store · v1.5.3

Awesome

Great app - wish they would add the ability to add TRT. Would also like to be able to “adjust dose” for a saved vial since it’s common to titrate up.

V
Verax21
App Store · v1.3.0

A real game changer!

I’ve been using this app for about 1 week and I must say I’m terribly impressed with the ease of use and functionality. My peptide journey feels like it has a useful tool now. Previously, I’d been using Google Sheets to track my pins, but ShotTrackr has given me a much more streamlined approach to tracking. Not only is the app great, my data is mine AND the license is too. It’s a refreshing change to the usual subscription-based platform and data mining most apps perform. 10/10!

P
PlantGrrrl
App Store · v1.2.1
FAQ

Things you're probably wondering.

What is ShotTrackr?

ShotTrackr is a native iOS app for managing peptide therapy. It calculates precise injection doses, tracks vial inventory, logs doses with injection sites, and monitors wellness metrics like weight, all in a clean, private interface.

Is my health data private?

Yes. ShotTrackr stores all of your data locally on your device. There are no user accounts and no cloud database. We never see your inventory, dose logs, or weight history.

What's new in version 2?

Version 2 introduces Simple Mode (a focused experience for users who don't need full inventory tracking), the Medication Level chart showing historical and projected levels, titration and cycle scheduling, smarter notifications grouped by day, a new Analytics page with dose and weight trend graphs, and CSV/PDF export for your full history.

What syringe sizes are supported?

The three common insulin-syringe sizes: 1 ml (100 units), 0.5 ml (50 units), and 0.3 ml (30 units). The visual calculator adapts automatically so you see exactly how many units to draw.

Can I track multiple peptides at once?

Yes. You can track unlimited active and stock vials simultaneously. ShotTrackr has a built-in database of common peptides with autocomplete, plus full support for custom peptide names and multi-component Blends and Stacks.

Will there ever be a subscription?

No. ShotTrackr is a single one-time purchase of $3.99. No monthly fees, no feature paywalls, no ads. You pay once and you keep the app, including future updates, forever.

Does it work without an internet connection?

Completely. Every feature — calculations, schedules, reminders, logging — runs locally on your device. The app never needs the network to function.

Blaine, the developer of ShotTrackr
From the developer

Built for myself first.

Hi, I'm Blaine. I built ShotTrackr because I needed a clean, simple way to manage my own peptide protocol, and every app I tried was cluttered, paywalled, or trying to do too much.

So I built the tool I wished existed. It does two things well: track peptides and track weight. I use it every day, and most of what's in the app started as a request from someone who emailed me.

My promise: no subscriptions, no ads, no accounts. A private, one-time-purchase app that respects your data and your wallet.

— Blaine, somewhere in Alaska